Custom Pool & Spa Concepts is dedicated to designing a back yard retreat that not only fits your style and needs but also stands out above the rest in construction quality. We invite you to “dare to compare” our way of making your backyard dreams a reality.
The success of Custom Pool & Spa Concepts has been our commitment to design and build pools that meet the highest standards of residential and commercial construction. Our devoted craftsmen and designers have designed and built pools and spas to add value and style to even the most challenging landscapes. We believe the true beauty of each custom-designed pool and spa is the quality of the materials and craftsmanship, which ensures years of enjoyment. At Custom Pool & Spa Concepts we build more than pools- we build relationships.
- No high pressure sales tactics
- Communicate with us every day
- Most pools completed in 17 – 21 days
- No hidden costs
- Service after the sale, our staff will respond to requests for warranty work usually within 48 hours.
- Most pools completed in 17-21 days. We schedule your project from start to finish, therefore there are no days wasted waiting for an opening in the schedule, keeping the construction process running smoothly and on time.
- Of course, some projects take more time such as the additional of cabana, landscaping or lager water features.
Communicate with us every day. Communication during the construction of your project assures you the process will go smoothly and on schedule, and to answering any questions or concerns, you might have during these stages. We have a supervisor on site during each stage of construction. This assures you that our quality of work is going to meet the highest of standards. Each project has its share of challenges. Custom Pool & Spa Concepts meets these challenges head on and will not hide form them.
Service after completion, our staff will respond to request for warranty work within 48 hours.
Layout & Excavation
Your pool layout will be marked in your yard, by taking the dimensions of your pool and marking the area for excavation. After you approve the layout, the excavation process begins by the use of a bobcat excavating the dirt to form the basic shape of your pool.
Steel, Plumbing & Equipment
After excavation, steel is applied in the excavated area. Walls and floor consist of # 3-schedule rebar 8” on center making a grid pattern, and beams are # 4-schedule rebar. The plumbing stub out is done and the equipment is set.
Gunite
Gunite is a hydrated cement and sand mixture blown into the steel frame to form a foundation that has a minimum 4,000 PSI finished strength rating. At this stage, your pool takes final shape will all the benches, tanning shelves and steps formed.
Tile, Coping & Decking
Waterline tile is installed around the inside perimeter of pool, which provides aesthetic beauty. The coping is also installed around the outer perimeter of the pool; rock waterfalls or other water features are installed at this time. Decking design is laid out with forms according to your plans and concrete is poured, decking consist of 4” thick concrete with a minimum of 3,000 PSI with # 3-schedule rebar tiled on 16” centers to form a grid pattern. The decking is tied into the swimming pool, keeping the deck from pulling away from the pool.
Plaster & Start Up
The pool plaster finish you have chosen is applied, sealing the gunite, and creating a waterproof lining for your pool. Immediately after plastering, water is added, all the equipment is tested, and chemicals are started. Its now time for Pool School, where we will teach your everything you need to know to keep your pool clean, clear and running properly.